Olympic Stadium - London 2012

Olympic Stadium - London 2012

Our experience was based at site through the construction phase as part of a multidisciplinary design team employed directly by Sir Robert McAlpine group as contractor. This construction team model afforded us a direct working relationship with the principle contractor's domestic subcontractors and meant design was made into production drawings and built at location in a 'production-line' scenario.